Learn how Midea achieved these results with the help of 3D simulation software:
- Assembly line floor area reduced by 10%, while simultaneously increasing production capacity by 10%
- Improved product quality, reducing the reject ratio from 1,200 defects per million to 120 dpm.
- 20% savings in schedule (construction reduced from 15 to 12 weeks).
- Total cost savings realized for the project were about $879,000.